NEWS CENTER

HEI's first biomass power generation project is successfully connected to the grid

source:

Page view:

Time:2020-12-12

On December 12th, Fuyuan1X30MW biomass cogeneration project which is undertaken by HEI, successfully completed its first synchronization. The unit's system parameters were normal and the equipment was running stably.

This project is the first investment project of HE in the field of biomass power generation through industrial transformation. It adopts 1×130t/h high temperature and high pressure circulating fluidized bed biomass boiler and 1×30MW condensing steam turbine generator set which are independently developed and designed by HE. The scope includes heating with low vacuum, outlet system and municipal heating pipe network construction. After the project is completed and put into operation, it can produce 195 million kilowatt-hours of green power annually, consume 240,000 tons of straw annually, and save 100,000 tons of standard coal annually. More than 300 farmers will be employed in the links of fuel collection, storage, storage and transportation every year. Especially for the effective utilization and consumption of straw in the whole city, which plays an important role.

TOP