350MW condensing, extration and backpressure turbine (NCB)
HBC made its first set of superhigh pressure parameter 670-680t/h boiler configured for 200MW turbine generator in 1960s, first case in China. After years of development and perfection, the boiler burning anthracite, meagre coal, bitumite, lignite, oil and gas is developed in succession, when the complete furnace series takes shape. It is exported to Pakistan. Ever since 1980s, under the guidance of ...
HEC HBC developed and made its first high temperature and high pressure parameter 410t/h boiler configured for 100MW turbine generator set in the early 1960s, and furnace burning anthracite, bitumite, meagre coal, lignite, oil and gas is developed in succession, when the complete furnace series takes shape. We have made 100-plus set to date. On such basis, we developed such high pressure boiler types ...
HEC HBC developed and made its first high temperature and high pressure parameter 410t/h boiler configured for 100MW turbine generator set in the early 1960s, and furnace burning anthracite, bitumite, meagre coal, lignite, oil and gas is developed in succession, when the complete furnace series takes shape. We have made 100-plus set to date. On such basis, we developed such high pressure boiler types ...
HEC HBC designed and made its first set of high temperature and high pressure 220t/h~240t/h boiler configured for 50MW turbine generator set in 1958. It is primarily designed in compliance with former Soviet Union drawings. As early as 1980s, such advanced technology as membrane tube water wall, membrane type roof tube, drum centralized downcomer, double-pillar all-steel structure, complete with high-...
Model: NZK660-24.2/566/566